Introduction

PJM Interconnection (PJM) is the country’s largest regional transmission organization, serving 67 million customers across Maryland and all or parts of 12 other states and Washington, D.C. While local utilities own and operate distribution equipment (i.e., poles and wires), and energy companies own generation in Maryland, it is PJM that is ultimately responsible for the reliable operation of the grid. PJM also runs wholesale energy markets, plans the high-voltage transmission network, and manages the interconnection queue for new generation projects. So while Maryland, through legislation and state regulatory agencies, must review and approve utility rates and spending, as well as the type of generation built in state, PJM manages the electricity markets which set prices for project developers, as well as the planning and approval process for transmission to connect generation to the grid. These roles give PJM authority over what energy projects are built, how reliable electricity is, and how much electricity costs.

Governance

PJM is a private organization, and its operational rules, which govern its energy auctions, are set by its board and voting stakeholder members. The majority of stakeholder members are the for-profit companies (transmission and generation owners, as well as utilities) that operate in PJM’s footprint. Although there is some limited voting representation in the stakeholder process for Marylanders –  through the Office of People’s Counsel (OPC) – this vote is diluted compared to industry, especially in lower-level stakeholder committees1 in which affiliate voting is allowed. For example, where OPC might have one vote in a lower-level committee, Exelon Utilities would have 6 total affiliate votes – 3 of which are represented by Maryland utilities: BGE, Pepco, and Delmarva Power and Light. Maryland’s other venues for influencing, albeit not voting at PJM – include its membership in the Organization of PJM States, inc. (OPSI), and recently the State Legislators Collaborative, the National Caucus of Environmental Legislators, and the PJM Governors Collaborative2. These groups have been instrumental in pushing for governance reform at PJM – decisions made at the Federal Energy Regulatory Commission (FERC) – as well as securing a price cap for PJM’s capacity market, which is estimated to have saved at least $13 billion in costs from being passed along to ratepayers in PJM in a given year.

Energy Generation: Gaps and Misplaced Priorities

While the Maryland Public Service Commission (PSC) officially approves building new energy generation projects through Certificates of Public Convenience and Necessity (CPCN), and the legislature directs the state’s energy mix priorities (e.g., directly through procurement targets such as the POWER Act, or provisions of the Utility RELIEF Act), PJM heavily influences what facilities can actually be built. Proposed projects must secure an interconnection agreement from PJM and pay for any upgrades needed to connect them to the regional transmission grid. Further, PJM controls the mechanisms that send economic market signals to generation developers. PJM’s rules have delayed clean energy deployment, with approximately 285 gigawatts (GWs)  of clean generation attempting, and failing, to receive an interconnection agreement since 2020. At the same time, PJM rules have fast-tracked new gas generation—including in Maryland through its Resource Reliability Initiative (RRI). Moreover, PJM has applied to run a secondary “fast track” process called the Expedited Interconnection Tract (EIT), which, similar to the RRI, heavily favors developers of new gas power. PJM sets the rules for these processes (see Governance section above), which have prioritized development of generation with high capacity factors (i.e., facilities that are available 24/7/365), as determined by the PJM-assigned Effective Load Carrying Capacity (ELCC) value. These rules penalize cleaner, cost-effective, and faster-to-construct generation alternatives while prioritizing fossil fuels.

Moving forward, if the rules stay the same, battery energy storage systems could be the beneficiary of rules prioritizing capacity because of the immense benefits they bring to the grid because of their comparatively low cost and build time for a high-capacity value asset. Unlocking storage’s full potential for both reliability and affordability means pairing it with clean and renewable energy on the grid.

Load and Reliability

PJM is seeing rapidly surging load growth, the vast majority of which comes from large load additions – i.e., data centers – and threatens the clean energy transition, ratepayer affordability, and reliability.

Ratepayers can already feel the effects. PJM conducts regular capacity auctions, where it secures promises from power suppliers to provide enough energy resources for the future. Rising demand has made it more difficult for PJM to meet its needs, resulting in record-high auction prices, prices that would have been substantially higher but for the negotiated price cap. These prices translate to higher electric bills for utility customers. More concerningly, for the first time ever, PJM missed its reliability target in capacity auctions held in December 2025 and July 2026 for delivery years3 2027/2028 and 2028/2029 – meaning there is an increased risk PJM won’t be able to secure energy to meet the region’s needs. PJM has a potential generation output of approximately 182 GW, but not all of it is available at all times due to outages, maintenance, etc. In 2026, PJM hit a record for peak summer demand of 168 GW, of which about 6 GW was met by demand response programs.

Despite being within its reliability target for this delivery year, PJM has turned to an emergency posture multiple times in 2026, directing the use of non-economic dispatch (i.e., expensive generation) and securing numerous 202(c) orders from the Department of Energy under the Federal Power Act, which allows for the use of emergency generation and is not subject to any federal or state environmental regulatory controls. Five of these orders allowed PJM to direct data centers to disconnect from the grid and run their backup generators on emergency footing (not subject to runtime or environmental rules). In aggregate, this raises serious questions about how new large-load systems will be integrated into the grid – both in Maryland and in PJM broadly.

PJM is facing difficult decisions with large loads coming online, or at least being forecasted to come online, faster than anyone anticipated. They are trying to set up the structure to bring more capacity online to meet this demand. The rules set by PJM, whose voting members are overwhelmingly incumbent energy generators and utilities, and operationalized through its interconnection structure and fast-track queues, currently benefit gas over clean energy like solar. This is contrary to what Marylanders need, which is more electrons on the grid right now. Clean energy paired with storage is the fastest, most cost-effective option to provide least-cost reliable electricity to Marylanders.

This content was prepared for the Bright Future Maryland Coalition by the Center for Progressive Reform and Maryland LCV Education Fund.

MORE:

Maryland LCV and partners PJM press conference in May 2026.
Baltimore energy advocates press PJM over data center costs, WBAL News Radio
Maryland leaders call for reforms within regional grid operator amid annual conference,
WYPR
Governor, lawmakers call for reforms at PJM to lower energy bills, Fox TV 45
Maryland lawmakers press electric grid operator on skyrocketing bills
, Baltimore Banner


1: As a rough analogy, in PJM’s governance process, stakeholder committees operate not dissimilar from legislative committees or subcommittees; actions there are not final, but have a strong impact in shaping what policies and initiatives make their way up to voting or board action that will be put into effect.

2: Maryland representatives and agency heads have, in the last year, taken strong leadership positions in engaging with PJM through OPSI, the legislators’ collaborative, and the National Caucus of Environmental Legislators. Governor Moore has also been extremely active within the context of the governors’ collaborative.

3: A delivery year runs from June 1 of the starting year through May 31 of the ending year. Currently, we are in the 2026/2027 delivery year.